The LiquidPlanner modules allow you to create, update, list, retrieve, and delete the estimates, treeitems, clients, tasks, projects, packages, comments, checklist items for a task, timesheets, timer, events, milestones, folders, partial day events, dependencies, links, commands, and notes for items in your LiquidPlanner account.

Getting Started with LiquidPlanner

Prerequisites

  • A LiquidPlanner account

In order to use LiquidPlanner with Integromat, it is necessary to have a LiquidPlanner account. If you do not have one, you can create a LiquidPlanner account at liquidplanner.com/.

The module dialog fields that are displayed in bold (in the Integromat scenario, not in this documentation article) are mandatory!

Connecting LiquidPlanner to Integromat

1. Go to Integromat and open the LiquidPlanner module's Create a connection dialog.

OvPsfLa7yb.gif

2. In the Connection name field, enter a name for the connection.

3. In the Email and Password field, enter your LiquidPlanner account login credentials.

4. In the Workspace ID field, enter your account workspace details. You can find Workspace ID at Your Profile Icon > Settings > Workspace Summary.

mXLAeyz1gz.gif

5. Click Continue.

The connection has been established.

Estimates

Create an Estimate for Task

Creates an estimate for a task.

ConnectionEstablish a connection to your LiquidPlanner account.
Task IDSelect or map the Task ID whose estimate you want to create.
WorkEnter the number of hours worked on the selected task.  For example, 4h0.5d.
Activity IDSelect or map the Activity ID whose estimate you want to create. Mandatory when providing low, high, and member ID.
Member IDSelect or map the Member ID to whom the activity is assigned. Mandatory when providing activity ID, low, and high values.
LowEnter the minimum of hours estimated to complete the activity. If you are providing low values, it is mandatory to provide activity ID, member ID, and high values. For example, 4h0.5d.
HighEnter the maximum number of hours estimated to complete the activity. If you are providing low values, it is mandatory to provide activity ID, member ID, and high values. For example, 4h0.5d.
Is DoneSelect whether the task is done.
Done OnEnter the date when the task is completed. See the list of supported date and time formats.
Work Performed OnEnter the date when the work on the task is performed on. See the list of supported date and time formats.
CommentEnter the details of the work done or any other information about the task.

Create an Estimate for an Event

Creates an estimate for an event.

ConnectionEstablish a connection to your LiquidPlanner account.
Event IDSelect or map the Event ID whose estimate you want to create.
WorkEnter the number of hours worked on the selected event.  For example, 4h0.5d.
Activity IDSelect or map the Activity ID whose estimate you want to create. Mandatory when providing low, high, and member ID.
Member IDSelect or map the Member ID to whom the activity is assigned. Mandatory when providing activity ID, low, and high values.
LowEnter the minimum of hours or days estimated to complete the event. If you are providing low values, it is mandatory to provide activity ID, member ID, and high values. For example, 4h0.5d.
HighEnter the maximum number of hours or days estimated to complete the event. If you are providing low values, it is mandatory to provide activity ID, member ID, and high values. For example, 4h0.5d.
Is DoneSelect whether the event is done.
Done OnEnter the date when the event is completed. See the list of supported date and time formats.
Work Performed OnEnter the date when the work on the event is performed on. See the list of supported date and time formats.
CommentEnter the details of the work done or any other information about the event.

Create an Estimate for a Partial Day Event

Creates an estimate for a partial day event.

ConnectionEstablish a connection to your LiquidPlanner account.
Partial Day Event IDSelect or map the Partial Day Event ID whose estimate you want to create.
WorkEnter the number of hours worked on the selected Partial Day Event.  For example, 4h0.5d.
Activity IDSelect or map the Activity ID whose estimate you want to create. Mandatory when providing low, high, and member ID.
Member IDSelect or map the Member ID to whom the activity is assigned. Mandatory when providing activity ID, low, and high values.
LowEnter the minimum of hours estimated to complete the activity. If you are providing low values, it is mandatory to provide activity ID, member ID, and high values.  For example, 4h0.5d.
HighEnter the maximum number of hours estimated to complete the activity. If you are providing low values, it is mandatory to provide activity ID, member ID, and high values.  For example, 4h0.5d.
Is DoneSelect whether the partial day event is done. See the list of supported date and time formats.
Done OnEnter the date when the partial day event is completed. See the list of supported date and time formats.
Work Performed OnEnter the date when the work on the partial day event is performed on. See the list of supported date and time formats.
CommentEnter the details of the work done or any other information about the partial day event.

Create an Estimate for a Milestone

Creates an estimate for a milestone.

ConnectionEstablish a connection to your LiquidPlanner account.
Milestone IDSelect or map the Milestone ID whose estimate you want to create.
WorkEnter the number of hours worked on the selected milestone.  For example, 4h0.5d.
Activity IDSelect or map the Activity ID whose estimate you want to create. Mandatory when providing low, high, and member ID.
Member IDSelect or map the Member ID to whom the activity is assigned. Mandatory when providing activity ID, low, and high values.
LowEnter the minimum of hours estimated to complete the activity. If you are providing low values, it is mandatory to provide activity ID, member ID, and high values. For example, 4h0.5d.
HighEnter the maximum number of hours estimated to complete the activity. If you are providing low values, it is mandatory to provide activity ID, member ID, and low values. For example, 4h0.5d.
Is DoneSelect whether all the items of the milestone are done.
Done OnEnter the date when all the items of the milestone are completed. See the list of supported date and time formats.
Work Performed OnEnter the date when the work on the milestone is performed on. See the list of supported date and time formats.
CommentEnter the details of the work done or any other information about the milestone.

Treeitems

List Treeitems

Gets a list of all treeitems.

ConnectionEstablish a connection to your LiquidPlanner account.
LimitSet the maximum number of treeitems Integromat should return during one execution cycle.

Get a Treeitem

Gets info about specific treeitem by ID.

ConnectionEstablish a connection to your LiquidPlanner account.
Treeitem IDSelect or map the Treeitem ID whose details you want to retrieve.

Update a Treeitem

Updates a specific treeitem.

ConnectionEstablish a connection to your LiquidPlanner account.
Treeitem IDSelect or map the Treeitem ID whose details you want to update.
NameEnter a new name for the Treeitem.
Activity IDSelect or map the Activity ID of the activity most recently used for tracking the time related to the item.
Custom Field ValuesAdd the custom fields and their values in JSON or XML format.
Done OnSelect whether this item is completed.
Started OnEnter the date and time when the work on this item is started. See the list of supported date and time formats.
Delay UntilEnter the date and time until when the work on the Treeitem should be delayed. See the list of supported date and time formats.
DescriptionEnter the details of the item.
Is DoneSelect whether the work on the item is completed
Is on HoldSelect whether the work on this item is on hold.
Is SharedSelect whether the task for this item is visible in the project.
Manual AlertEnter the details to receive the manual alerts for any updates on this item.
Max EffortEnter the number of hours limited to work on this item.
AssignmentsEnter the assignment details related to this item.
Parent IDEnter the parent task ID to which this item is a subtask.
DateEnter the date by when the work on this item should be completed. See the list of supported date and time formats.
External ReferenceEnter an external reference ID from an external system. 
Package IDEnter the package ID to which this task belongs to.
Work In OrderSelect whether this task is a work in order.

Delete a Treeitem

Deletes specific treeitems from a workspace.

ConnectionEstablish a connection to your LiquidPlanner account.
Treeitem IDSelect or map the Treeitem ID you want to delete.

Clients

You do not have to add the webhooks in the LiquidPlanner as it is automatically done for you once you add and save an instant trigger module to your scenario.

Watch Clients

Triggers when a client has been created or updated.

Webhook NameEnter a name for the webhook.
ConnectionEstablish a connection to your LiquidPlanner account.

Create a Client

Creates a client in a workspace.

ConnectionEstablish a connection to your LiquidPlanner account.
NameEnter the name of the client.
Done OnEnter the date when a client is created in the workspace. See the list of supported date and time formats.
DescriptionEnter the details of the client.
Is DoneSelect whether all the task of the client is done.
Is On HoldSelect whether any of the tasks of the client is on hold.
Manual AlertEnter whether you want to receive manual alerts for client tasks.
Assignments

Add assignments:

Person IDEnter (map) the Person ID to whom the assignment is assigned.
Team IDEnter (map) the Team ID to whom the assignment is assigned.
Low Effort RemainingEnter the minimum of hours estimated to complete the activity. For example, 4h0.5d.
High Effort RemainingEnter the maximum number of hours estimated to complete the activity. For example, 4h0.5d.
Treeitem IDEnter (map) the Treeitem ID associated with the assignment.
Space IDEnter (map) the Space ID associated with the assignment.
Activity IDEnter (map) the Activity ID associated with the assignment.
Is DoneSelect whether the assignment is done.
Done OnEnter the date when the assignment is completed. See the list of supported date and time formats.
Daily LimitEnter the daily number of work hours limited to work on this task.
PositionEnter the position number of this assignment in the total assignments list.
Hours LoggedEnter the number of hours logged for this assignment.
Expected FinishEnter the date and time by which this assignment is expected to complete. See the list of supported date and time formats.
Expected StartEnter the date and time by when the work on assignment is expected to start. See the list of supported date and time formats.
Can DestroySelect whether this assignment is destroyable.
Is OwnerSelect whether the assigned member is an owner of this assignment.
TypeEnter the assignment type. For example, installation.
IDEnter the Assignment ID.
Contract ValueEnter the amount associated with the client's contract.
External ReferenceEnter the external reference ID of the client in an external system.

List Client

Gets a list of all clients.

ConnectionEstablish a connection to your LiquidPlanner account.
LimitSet the maximum number of clients Integromat should return during one execution cycle.

Get a Client

Gets info about specific clients.

ConnectionEstablish a connection to your LiquidPlanner account.
Client IDSelect or map the Client ID whose details you want to retrieve.

Update a Client

Updates information about the client.

ConnectionEstablish a connection to your LiquidPlanner account.
Client IDSelect or map the Client ID whose details you want to update.
NameEnter the name of the client.
Done OnEnter the date when a client is created in the workspace. See the list of supported date and time formats.
DescriptionEnter the details of the client.
Is DoneSelect whether all the task of the client is done.
Is On HoldSelect whether any of the tasks of the client is on hold.
Manual AlertEnter whether you want to receive manual alerts for client tasks.
Assignments

Add assignments:

Person IDEnter (map) the Person ID to whom the assignment is assigned.
Team IDEnter (map) the Team ID to whom the assignment is assigned.
Low Effort RemainingEnter the minimum of hours estimated to complete the activity. For example, 4h0.5d.
High Effort RemainingEnter the maximum number of hours estimated to complete the activity. For example, 4h0.5d.
Treeitem IDEnter (map) the Treeitem ID associated with the assignment.
Space IDEnter (map) the Space ID associated with the assignment.
Activity IDEnter (map) the Activity ID associated with the assignment.
Is DoneSelect whether the assignment is done.
Done OnEnter the date when the assignment is completed. See the list of supported date and time formats.
Daily LimitEnter the daily number of work hours limited for this task.
PositionEnter the position number of this assignment in the total assignments list.
Hours LoggedEnter the number of logged for this assignment.
Expected FinishEnter the date and time by which this assignment is expected to complete. See the list of supported date and time formats.
Expected StartEnter the date and time by when the work on assignment is expected to start. See the list of supported date and time formats.
Can DestroySelect whether this assignment is destroyable.
Is OwnerSelect whether the assigned member is an owner of this assignment.
TypeEnter the assignment type. For example, installation.
IDEnter the Assignment ID.
Contract ValueEnter the amount associated with the client's contract.
External ReferenceEnter the external reference ID of the client in an external system.

Delete a Client

Deletes a specific client by ID.

ConnectionEstablish a connection to your LiquidPlanner account.
Client IDSelect or map the Client ID you want to delete.

Tasks

You do not have to add the webhooks in the LiquidPlanner as it is automatically done for you once you add and save an instant trigger module to your scenario.

Watch Tasks

Triggers when a task has been created or updated.

Webhook NameEnter a name for the webhook.
ConnectionEstablish a connection to your LiquidPlanner account.

List Tasks

Gets a list of tasks.

ConnectionEstablish a connection to your LiquidPlanner account.
LimitSet the maximum number of tasks Integromat should return during one execution cycle.

Get a Task

Gets a specific task by ID.

ConnectionEstablish a connection to your LiquidPlanner account.
Task IDSelect or map the Task ID whose details you want to retrieve.

Create a Task

Creates a new task in LiquidPlanner.

ConnectionEstablish a connection to your LiquidPlanner account.
NameEnter a name for the task.
Activity IDSelect or map the Activity ID related to the task.
Custom Field NameEnter a custom field name.
ValueEnter the value for the custom field.
Done OnEnter the date when the task is completed. See the list of supported date and time formats.
Started OnEnter the date when the work on the task is started. See the list of supported date and time formats.
Delay UntilEnter the date and time until which you want to delay the work on this task. See the list of supported date and time formats.
DescriptionEnter the details of the task.
Is DoneSelect whether the task is completed.
Is On HoldSelect whether the task is on hold.
Manual AlertEnter whether you want to receive the manual alert for this task.
Is SharedSelect whether the task is visible on the project.
Max EffortEnter the maximum number of hours allocated for the task. You will receive a trigger if the mentioned hours are exceeded.
Assignments

Add the assignments related to the task:

Person IDEnter (map) the Person ID to whom the assignment is assigned.
Team IDEnter (map) the Team ID to whom the assignment is assigned.
Low Effort RemainingEnter the minimum of hours estimated to complete the activity. If you are providing low values, it is mandatory to provide activity ID, member ID, and high values. For example, 4h0.5d.
Max Effort RemainingEnter the maximum number of hours estimated to complete the activity. If you are providing low values, it is mandatory to provide activity ID, member ID, and high values. For example, 4h0.5d.
Treeitem IDEnter (map) the Treeitem ID associated with the assignment.
Space IDEnter (map) the Space ID associated with the assignment.
Activity IDEnter (map) the Activity ID associated with the assignment.
Is DoneSelect whether the assignment is done.
Done OnEnter the date when the assignment is completed. See the list of supported date and time formats.
Daily LimitEnter the daily number of work hours limited for the task.
PositionEnter the position number of this assignment in the total assignments list.
Hours LoggedEnter the number of hours logged for this assignment.
Expected FinishEnter the date and time by which this assignment is expected to complete. See the list of supported date and time formats.
Expected StartEnter the date and time by when the work on assignment is expected to start. See the list of supported date and time formats.
Can DestroySelect whether this assignment is destroyable.
Is OwnerSelect whether the assigned member is an owner of this assignment.
TypeEnter the assignment type. For example, installation.
IDEnter the Assignment ID.
Parent IDEnter the Parent Task ID if this task is a subtask.
Promise ByEnter the date by when the task is promised to complete. If the date is missed, you will receive an alert. See the list of supported date and time formats.
External ReferenceEnter the task's external reference number to identify the task from an external system.
Package IDsSelect the Package IDs related to the task.
Work On OrderSelect whether the task is work on the order.

Update a Task

Updates specific tasks.

ConnectionEstablish a connection to your LiquidPlanner account.
Task ID Select or map the Task ID whose details you want to update.
NameEnter a new name for the task.
Activity IDSelect or map the Activity ID related to the task.
Custom Field NameEnter a custom field name.
ValueEnter the value for the custom field.
Done OnEnter the date when the task is completed. See the list of supported date and time formats.
Started OnEnter the date when the work on the task is started. See the list of supported date and time formats.
Delay UntilEnter the date and time until which you want to delay the work on this task. See the list of supported date and time formats.
DescriptionEnter the details of the task.
Is DoneSelect whether the task is completed.
Is On HoldSelect whether the task is on hold.
Manual AlertEnter whether you want to receive the manual alert for this task.
Is SharedSelect whether the task details are visible on the project.
Max EffortEnter the maximum number of hours allocated for the task. You will receive a trigger if the mentioned hours are exceeded.
Parent IDEnter the Parent Task ID if this task is a subtask.
Promise ByEnter the date by when the task is promised to complete. If the date is missed, you will receive an alert. See the list of supported date and time formats.
External ReferenceEnter the task's external reference number to identify the task from an external system.
Package IDsAdd the Package IDs related to the task.
Work On OrderSelect whether the task is work on the order.

Delete a Tasks

Deletes a specific task.

ConnectionEstablish a connection to your LiquidPlanner account.
Task IDSelect or map the Task ID you want to delete.

Projects

You do not have to add the webhooks in the LiquidPlanner as it is automatically done for you once you add and save an instant trigger module to your scenario.

Watch Projects

Triggers when a project has been created or updated.

Webhook NameEnter a name for the webhook.
ConnectionEstablish a connection to your LiquidPlanner account.

List Projects

Gets a list of all projects.

ConnectionEstablish a connection to your LiquidPlanner account.
LimitSet the maximum number of projects Integromat should return during one execution cycle.

Get a Project

Gets a specific project by ID.

ConnectionEstablish a connection to your LiquidPlanner account.
Project IDSelect or map the Project ID whose details you want to retrieve.

Create a Project

Creates a new project.

ConnectionEstablish a connection to your LiquidPlanner account.
NameEnter a name for the project.
Done OnEnter the date when the task related to the project are completed. See the list of supported date and time formats.
DescriptionEnter the project details.
Is DoneSelect whether the tasks are related to the project.
Is on HoldSelect whether the tasks related to the project are on hold.
Manual AlertEnter the details when you want to receive the manual alerts for any modifications in the project
Contract ValueEnter the amount involved in the project.
AssignmentsAdd the assignments related to the project.
External ReferenceEnter the external reference number related to the project.

Update a Project

Updates a specific project.

ConnectionEstablish a connection to your LiquidPlanner account.
Project IDSelect or map the Project ID whose details you want to update.
NameEnter a name for the project.
Done OnEnter the date when the task related to the project are completed. See the list of supported date and time formats.
DescriptionEnter the project details.
Is DoneSelect whether the tasks are related to the project.
Is on HoldSelect whether the tasks related to the project are on hold.
Manual AlertEnter the details when you want to receive the manual alerts for any modifications in the project.
Contract ValueEnter the amount involved in the project.
AssignmentsAdd the assignments related to the project.
External ReferenceEnter the external reference number related to the project.

Delete a Project

Deletes a specific project from the workspace.

ConnectionEstablish a connection to your LiquidPlanner account.
Project IDSelect or map the Project ID you want to delete.

Packages

You do not have to add the webhooks in the LiquidPlanner as it is automatically done for you once you add and save an instant trigger module to your scenario.

Watch Packages

Triggers when a package has been created or updated.

Webhook NameEnter a name for the webhook.
ConnectionEstablish a connection to your LiquidPlanner account.

List Packages

Gets a list of packages.

ConnectionEstablish a connection to your LiquidPlanner account.
LimitSet the maximum number of treeitems Integromat should return during one execution cycle.

Get a Package

Gets a specific package by ID.

ConnectionEstablish a connection to your LiquidPlanner account.
Package IDSelect or map the Package ID whose details you want to retrieve.

Create a Package

Creates a new package.

ConnectionEstablish a connection to your LiquidPlanner account.
NameEnter the package name.
Done OnEnter (map) the date on which this item was completed. By default, it takes the present day, defaulted to today if the item is marked done today See the list of supported date and time formats.
Delay UntilEnter the date and time until which you want to delay the work on this item. See the list of supported date and time formats.
DescriptionEnter the details of the task.
Is DoneSelect whether the items in the package are completed.
Is On HoldSelect whether the items in the package are on hold.
Manual AlertEnter teh number of times you want to receive the alerts for any update on this item. 
Max EffortEnter the maximum number of hours allocated for this item. You will receive a trigger if the mentioned hours are exceeded.
Parent IDEnter the Parent ID to which this item is a part.
Promise ByEnter the date by when the item is promised to complete. If the specified date is in past, you will receive an alert. See the list of supported date and time formats.
External ReferenceEnter the item's external reference number to identify the item from an external system.

Update a Package

Updates a specific package.

ConnectionEstablish a connection to your LiquidPlanner account.
Package IDSelect or map the Package ID whose details you want to update.
NameEnter the package name.
Done OnEnter (map) the date on which this item was completed. By default, it takes the present day, defaulted to today if the item is marked done today. See the list of supported date and time formats.
Delay UntilEnter the date and time until which you want to delay the work on this item. See the list of supported date and time formats.
DescriptionEnter the details of the task.
Is DoneSelect whether the items in the package are completed.
Is On HoldSelect whether the items in the package are on hold.
Manual AlertEnter the number of times you want to receive the alerts for any update on this item.
Max EffortEnter the maximum number of hours allocated for this item. You will receive a trigger if the mentioned hours are exceeded.
Parent IDEnter the Parent ID to which this item is a part.
Promise ByEnter the date by when the item is promised to complete. If the specified date is in the past, you will receive an alert. See the list of supported date and time formats.
External ReferenceEnter the item's external reference number to identify the item from an external system.

Delete a Package

Deletes a specific package.

ConnectionEstablish a connection to your LiquidPlanner account.
Package IDSelect or map the Package ID you want to delete.

Comments

You do not have to add the webhooks in the LiquidPlanner as it is automatically done for you once you add and save an instant trigger module to your scenario.

Watch Comments

Triggers when a comment has been created or updated.

Webhook NameEnter a name for the webhook.
ConnectionEstablish a connection to your LiquidPlanner account.

Get a Comment

Gets a comment by ID.

ConnectionEstablish a connection to your LiquidPlanner account.
Comment IDSelect or map the Comment ID whose details you want to retrieve.

Add a Comment to an Item

Adds a comment to an item.

ConnectionEstablish a connection to your LiquidPlanner account.
Treeitem IDSelect or map the Treeitem ID for which you want to add a comment.
CommentEnter the comment text.
Item IDEnter (map) the Item ID to which the comment belongs to.

Update a Comment

Updates a specific comment.

ConnectionEstablish a connection to your LiquidPlanner account.
Treeitem IDSelect or map the Treeitem ID for which you want to add a comment.
Comment IDSelect or map the Comment ID you want to update.
CommentEnter the new comment text.
Item IDEnter (map) the Item ID to which the comment belongs.

Delete a Comment

Deletes a comment from a specific item.

ConnectionEstablish a connection to your LiquidPlanner account.
Comment IDSelect or map the Comment ID you want to delete.

Checklist Item for Task

Get a Checklist item for a Task

Gets a checklist item for a specific task by ID.

ConnectionEstablish a connection to your LiquidPlanner account.
Task IDSelect or map the Task ID whose checklist item details you want to retrieve.
Checklist Item IDSelect or map the Checklist Item ID whose details you want to retrieve.

Create a Checklist Item for a Task

Creates a checklist item for a specific task.

ConnectionEstablish a connection to your LiquidPlanner account.
Task IDSelect or map the Task ID to which you want to create the checklist item.
Sort OrderEnter the order to sort the items in the task.
NameEnter a name for the checklist.
Owner IDEnter (map) the Owner ID of the checklist.
CompletedSelect whether the checklist item for the task is completed.

Update a Checklist an Item for a Task

Updates checklist items for a specific task.

ConnectionEstablish a connection to your LiquidPlanner account.
Task IDSelect or map the Task ID to which you want to create the checklist item.
Checklist Item IDSelect or map the checklist Item ID whose details you want to update.
Sort OrderEnter the order to sort the items in the task.
NameEnter a name for the checklist.
Owner IDEnter (map) the Owner ID of the checklist.
CompletedSelect whether the checklist item for the task is completed.

Delete a Checklist Item for a Task

Deletes a checklist item for a specific task.

ConnectionEstablish a connection to your LiquidPlanner account.
Task IDSelect or map the Task ID whose checklist item you want to delete.
Checklist Item IDSelect or map the checklist Item ID you want to delete.

Events

List Events

Gets a list of events.

ConnectionEstablish a connection to your LiquidPlanner account.
LimitSet the maximum number of events Integromat should return during one execution cycle.

Get an Event

Gets a specific event by ID.

ConnectionEstablish a connection to your LiquidPlanner account.
Event IDSelect or map the Event ID whose details you want to retrieve.

Create an Event

Creates a full-day event.

ConnectionEstablish a connection to your LiquidPlanner account.
Activity IDSelect or map the Activity ID of the task related to the event.
Custom Field NameEnter the custom field name to add to the event.
ValueEnter the custom field value.
Start DateEnter the date on which the event starts. See the list of supported date and time formats.
DescriptionEnter the details of the event.
Is DoneSelect whether the tasks related to the event are completed.
Is On HoldSelect whether the task related to the event is on hold.
Is SharedSelect whether the tasks related to the event are visible in the project.
Manual AlertEnter whether you want to receive the manual alert for this task.
Max EffortEnter the maximum number of hours allocated for the task. You will receive a trigger if the mentioned hours are exceeded.
Assignments

Add the assignments related to the event:

Person IDEnter (map) the Person ID to whom the assignment is assigned.
Team IDEnter (map) the Team ID to whom the assignment is assigned.
Low Effort RemainingEnter the minimum of hours estimated to complete the activity. If you are providing low values, it is mandatory to provide activity ID, member ID, and high values. For example, 4h0.5d.
High Effort RemainingEnter the maximum number of hours estimated to complete the activity. If you are providing low values, it is mandatory to provide activity ID, member ID, and high values. For example, 4h0.5d.
Treeitem IDEnter (map) the Treeitem ID associated with the assignment.
Space IDEnter (map) the Space ID associated with the assignment.
Activity IDEnter (map) the Activity ID associated with the assignment.
Is DoneSelect whether the assignment is done.
Done OnEnter the date when the assignment is completed. See the list of supported date and time formats.
Daily LimitEnter the daily number of work hours limited for the task.
PositionEnter the position number of this assignment in the total assignments list.
Hours LoggedEnter the number of hours logged for this assignment.
Expected FinishEnter the date and time by which this assignment is expected to complete. See the list of supported date and time formats.
Expected StartEnter the date and time by when the work on assignment is expected to start. See the list of supported date and time formats.
Can DestroySelect whether this assignment is destroyable.
Is OwnerSelect whether the assigned member is the owner of this assignment.
TypeEnter the assignment type. For example, installation.
IDEnter the Assignment ID.
Parent IDEnter the Parent ID of which this event is a part.
Finish DateEnter the date by when the tasks related to the event are promised to complete. If the date is missed, you will receive an alert. See the list of supported date and time formats.
External ReferenceEnter the event's external reference ID to identify the event from an external system.
Package IDEnter (map) the Package ID to which this event belongs.

Update an Event

Updates a specific event.

ConnectionEstablish a connection to your LiquidPlanner account.
Event IDSelect or map the Event ID whose details you want to update.
Activity IDSelect or map the Activity ID of the task related to the event.
Custom Field NameEnter the custom field name to add to the event.
ValueEnter the custom field value.
Start DateEnter the date on which the event starts. See the list of supported date and time formats.
DescriptionEnter the details of the event.
Is DoneSelect whether the tasks related to the event are completed.
Is On HoldSelect whether the task related to the event is on hold.
Is SharedSelect whether the tasks related to the event are visible in the project.
Manual AlertEnter whether you want to receive the manual alert for this task.
Max EffortEnter the maximum number of hours allocated for the task. You will receive a trigger if the mentioned hours are exceeded.
Assignments

Add the assignments related to the event:

Person IDEnter (map) the Person ID to whom the assignment is assigned.
Team IDEnter (map) the Team ID to whom the assignment is assigned.
Low Effort RemainingEnter the minimum of hours estimated to complete the activity. If you are providing low values, it is mandatory to provide activity ID, member ID, and high values. For example, 4h0.5d.
High Effort RemainingEnter the maximum number of hours estimated to complete the activity. If you are providing low values, it is mandatory to provide activity ID, member ID, and high values. For example, 4h0.5d.
Treeitem IDEnter (map) the Treeitem ID associated with the assignment.
Space IDEnter (map) the Space ID associated with the assignment.
Activity IDEnter (map) the Activity ID associated with the assignment.
Is DoneSelect whether the assignment is done.
Done OnEnter the date when the assignment is completed. See the list of supported date and time formats.
Daily LimitEnter the daily number of work hours limited for the task.
PositionEnter the position number of this assignment in the total assignments list.
Hours LoggedEnter the number of logged for this assignment.
Expected FinishEnter the date and time by which this assignment is expected to complete. See the list of supported date and time formats.
Expected StartEnter the date and time by when the work on assignment is expected to start. See the list of supported date and time formats.
Can DestroySelect whether this assignment is destroyable.
Is OwnerSelect whether the assigned member is the owner of this assignment.
TypeEnter the assignment type. For example, installation.
IDEnter the Assignment ID.
Parent IDEnter the Parent ID of which this event is a part.
Finish DateEnter the date by when the tasks related to the event are promised to complete. If the date is missed, you will receive an alert. See the list of supported date and time formats.
External ReferenceEnter the event's external reference ID to identify the event from an external system.
Package IDEnter (map) the Package ID to which this event belongs.

Delete an Event

Deletes a specific event.

ConnectionEstablish a connection to your LiquidPlanner account.
Event IDSelect or map the Event ID whose details you want to delete.

Milestones

List Milestones

Gets a list of milestones.

ConnectionEstablish a connection to your LiquidPlanner account.
LimitSet the maximum number of milestones Integromat should return during one execution cycle.

Get a Milestone

Gets detail about a specific milestone.

ConnectionEstablish a connection to your LiquidPlanner account.
Milestone IDSelect or map the Milestone ID whose details you want to retrieve.

Create a Milestone

Creates a new milestone.

ConnectionEstablish a connection to your LiquidPlanner account.
NameEnter the name of the milestone.
Activity IDSelect or map the Activity ID related to the milestone.
DescriptionEnter the details of the milestone.
Is DoneSelect whether the tasks related to the milestone are completed.
Is On HoldSelect whether the tasks related to the milestone are on hold.
Is SharedSelect whether the tasks related to the milestone are visible in the project.
Manual AlertEnter the number of times you want to receive the manual alert for this task.
Max EffortEnter the maximum number of hours allocated for the tasks of the milestone. You will receive a trigger if the mentioned hours are exceeded.
Parent IDEnter the Parent ID of which this milestone is a part.
DateEnter the date by when the milestone is promised t complete. You will receive a trigger if the milestone is not done and this date is in past. See the list of supported date and time formats.
External ReferenceEnter the Reference ID to identify the milestone from an external system.
Package IDEnter (map) the Package ID to which this milestone belongs.

Update a Milestone

Updates a specific milestone.

ConnectionEstablish a connection to your LiquidPlanner account.
Milestone IDSelect or map the Milestone ID whose details you want to update.
NameEnter the name of the milestone.
Activity IDSelect or map the Activity ID related to the milestone.
DescriptionEnter the details of the milestone.
Is DoneSelect whether the tasks related to the milestone are completed.
Is On HoldSelect whether the tasks related to the milestone are on hold.
Is SharedSelect whether the tasks related to the milestone are visible in the project.
Manual AlertEnter the number of times you want to receive the manual alert for this task.
Max EffortEnter the maximum number of hours allocated for the tasks of the milestone. You will receive a trigger if the mentioned hours are exceeded.
Parent IDEnter the Parent ID of which this milestone is a part.
DateEnter the date by when the milestone is promised t complete. You will receive a trigger if the milestone is not done and this date is in past. See the list of supported date and time formats.
External ReferenceEnter the Reference ID to identify the milestone from an external system.
Package IDEnter (map) the Package ID to which this milestone belongs.

Delete a Milestone

Deletes a specific milestone.

ConnectionEstablish a connection to your LiquidPlanner account.
Milestone IDSelect or map the Milestone ID you want to delete.

Folders

List Folders

Gets a list of all folders.

ConnectionEstablish a connection to your LiquidPlanner account.
LimitSet the maximum number of folders Integromat should return during one execution cycle.

Get a Folder

Gets a specific folder by ID.

ConnectionEstablish a connection to your LiquidPlanner account.
Folder IDSelect or map the Folder ID whose details you want to retrieve.

Create a Folder

Creates a new folder in the workspace.

ConnectionEstablish a connection to your LiquidPlanner account.
NameEnter a name for the folder.
Done OnEnter the date when the tasks of the folder are completed. See the list of supported date and time formats.
Delay UntilEnter the date until which the work on the tasks related to the folder should be delayed. See the list of supported date and time formats.
DescriptionEnter the details of the folder.
Is DoneSelect whether the tasks of the folder are completed. 
Is On HoldSelect whether the tasks of the folder are on hold. 
Manual AlertEnter the number to receive the manual alerts about the folder.
Max EffortEnter the number of hours limited to work on the items of the folder. You will receive the triggers if the hours are exceeded.
Parent IDEnter the parent ID to which the items of the folder are part.
Promise ByEnter the date by when the items of the folder are promised to complete. If the specified date is missed, you will receive an alert. See the list of supported date and time formats.
External ReferenceEnter the reference ID from an external system for the folder.

Update a Folder

Updates a specific folder.

ConnectionEstablish a connection to your LiquidPlanner account.
Folder IDSelect or map the Folder ID whose details you want to update.
NameEnter a name for the folder.
Done OnEnter the date when the tasks of the folder are completed. See the list of supported date and time formats.
Delay UntilEnter the date until which the work on the tasks related to the folder should be delayed. See the list of supported date and time formats.
DescriptionEnter the details of the folder.
Is DoneSelect whether the tasks of the folder are completed. 
Is On HoldSelect whether the tasks of the folder are on hold. 
Manual AlertEnter the number to receive the manual alerts about the folder.
Max EffortEnter the number of hours limited to work on the items of the folder. You will receive the triggers if the hours are exceeded.
Parent IDEnter the parent ID to which the items of the folder are part.
Promise ByEnter the date by when the items of the folder are promised to complete. If the specified date is missed, you will receive an alert. See the list of supported date and time formats.
External ReferenceEnter the reference ID from an external system for the folder.

Delete a Folder

Deletes a specific folder.

ConnectionEstablish a connection to your LiquidPlanner account.
Folder IDSelect or map the Folder ID you want to delete.

Partial Day Events

List Partial Day Events

Gets a list of all partial day events.

ConnectionEstablish a connection to your LiquidPlanner account.
LimitSet the maximum number of partial day events Integromat should return during one execution cycle.

Get a Partial Day Event

Gets a specific partial-day event by ID.

ConnectionEstablish a connection to your LiquidPlanner account.
Partial Day Event IDSelect or map the Partial Day Event ID whose details you want to retrieve.

Create a Partial Day Event

Creates a partial-day event.

ConnectionEstablish a connection to your LiquidPlanner account.
NameEnter a name for the partial day event.
Activity IDSelect or map the Activity ID associated with the event.
Custom Field NameEnter a custom field name you are creating for the event. For example, event address.
ValueEnter the custom field value for the above.
Start TimeEnter the event's start time.
Finish TimeEnter the event's end time.
DescriptionEnter the event details.
Is DoneSelect whether all the tasks related to the event are completed.
Is on HoldSelect whether all the tasks related to the event are on hold.
Is SharedSelect whether all the tasks related to the event are visible in the project.
Manual AlertEnter the details if you want to receive the alerts for the event.
Max EffortEnter the maximum number of hours allowed to work on this package. You will receive a trigger if the limited hours are exceeded. 
Sharing Type

Select the option to specify the parent ID of the event for sharing:

  • Folders
  • Projects
  • Packages
Parent IDEnter (map) the Parent ID of the folder or project or package as selected above for this event.
External ReferenceEnter the external reference details of the event from an external system.
Package IDEnter the Package ID to which this event belongs.

Update a Partial Day Event

Updates a specific partial-day event.

ConnectionEstablish a connection to your LiquidPlanner account.
Partial Day Event IDSelect the Partial Day Event ID whose details you want to update.
NameEnter a name for the partial day event.
Activity IDSelect or map the Activity ID associated with the event.
Custom Field ValuesEnter the custom field name and their values for the event. For example, event address.
Start TimeEnter the event's start time.
Finish TimeEnter the event's end time.
DescriptionEnter the event details.
Is DoneSelect whether all the tasks related to the event are completed.
Is on HoldSelect whether all the tasks related to the event are on hold.
Is SharedSelect whether all the tasks related to the event are visible in the project.
Manual AlertEnter the details if you want to receive the alerts for the event.
Max EffortEnter the maximum number of hours allowed to work on this package. You will receive a trigger if the limited hours are exceeded. 
Parent IDEnter (map) the Parent ID of the folder or project or package to which the event belongs.
External ReferenceEnter the external reference details of the event from an external system.
Package IDEnter the Package ID to which this event belongs.

Delete a Partial Day Event

Deletes a specific partial-day event.

ConnectionEstablish a connection to your LiquidPlanner account.
Partial Day Event IDSelect or map the Partial Day Event ID you want to delete.

Dependencies 

List Dependencies

Gets a list of dependencies.

ConnectionEstablish a connection to your LiquidPlanner account.
LimitSet the maximum number of dependencies Integromat should return during one execution cycle.

Get a Dependency

Gets a specific dependency by ID.

ConnectionEstablish a connection to your LiquidPlanner account.
Treeitem IDSelect or map the Treeitem ID whose dependency details you want to retrieve. For example, Inboxactive projects.
Prerequisite Item IDEnter (map) the prerequisite Item ID that must be completed before starting this dependent item. 
Wait Time ValueEnter the value of the wait time for this dependency. For example, 5 for the number of days or hours. 
Wait Time UnitEnter the unit of the wait time value. For example, hoursdays.

Create a Dependency

Creates a dependency between two items.

ConnectionEstablish a connection to your LiquidPlanner account.
Treeitem IDSelect or map the Treeitem ID whose dependency you want to create. For example, Inboxactive projects.
Prerequisite Item IDEnter (map) the prerequisite Item ID that must be completed before starting this dependent item. 
Wait Time ValueEnter the value of the wait time for this dependency. For example, 5 for the number of days or hours. 
Wait Time UnitEnter the unit of the wait time value. For example, hoursdays.

Delete a Dependency

Deletes a dependency for a specific item.

ConnectionEstablish a connection to your LiquidPlanner account.
Treeitem IDSelect or map the Treeitem ID whose dependency details you want to delete. For example, Inboxactive projects.
Dependency IDSelect or map the Dependency ID you want to delete.

Links

List Links

Gets a list of links.

ConnectionEstablish a connection to your LiquidPlanner account.
LimitSet the maximum number of treeitems Integromat should return during one execution cycle.

Get a Link

Gets a specific link by ID.

ConnectionEstablish a connection to your LiquidPlanner account.
Treeitem IDSelect or map the Treeitem ID whose link details you want to retrieve. For example, Inboxactive projects.
Link IDSelect or map the Link ID whose details you want to retrieve.

Create a Link

Creates a specific link for an item.

ConnectionEstablish a connection to your LiquidPlanner account.
Treeitem IDSelect or map the Treeitem ID whose link you want to create. For example, Inboxactive projects.
DescriptionEnter the item details.
URLEnter the URL address for the item.

Update a Link

Updates a specific link for an item.

ConnectionEstablish a connection to your LiquidPlanner account.
Treeitem IDSelect or map the Treeitem ID whose link you want to update. For example, Inboxactive projects.
DescriptionEnter the item details.
Item IDEnter (map) the item ID whose link you want to update.
URLEnter the URL address for the item.

Delete a Link

Deletes a link from a specific item.

ConnectionEstablish a connection to your LiquidPlanner account.
Treeitem IDSelect or map the Treeitem ID whose link you want to delete. For example, Inboxactive projects.
Link IDSelect or map the Link ID you want to delete.

Notes for an Item

Get a note for an Item

Gets a specific not by ID.

ConnectionEstablish a connection to your LiquidPlanner account.
Treeitem IDSelect or map the Treeitem ID whose note details you want to retrieve. For example, Inboxactive projects.

Create a Note for an Item

Adds a note to the item.

ConnectionEstablish a connection to your LiquidPlanner account.
Treeitem IDSelect or map the Treeitem ID whose note you want to create. For example, Inboxactive projects.
NoteEnter the note text.

Update a Note for an Item

Updates a note for a specific item.

ConnectionEstablish a connection to your LiquidPlanner account.
Treeitem IDSelect or map the Treeitem ID whose note you want to create. For example, Inboxactive projects.
NoteEnter the new note text.

Delete a Note for an Item

Deletes a note for a specific item.

ConnectionEstablish a connection to your LiquidPlanner account.
Treeitem IDSelect or map the Treeitem ID whose note you want to delete. For example, Inboxactive projects.

Timer

Get a Timer 

Gets a timer for a specific item.

ConnectionEstablish a connection to your LiquidPlanner account.
Treeitem IDSelect or map the Treeitem ID whose details you want to retrieve. For example, Inboxactive projects.

Start a Timer

Starts a timer for a specific item.

ConnectionEstablish a connection to your LiquidPlanner account.
Treeitem IDSelect or map the Treeitem ID whose timer you want to start:
  • Event
  • Partial Day Events
  • Milestones
  • Tasks
Event IDSelect or map the Event ID whose timer you want to start.
Partial Day Event IDSelect or map the Partial Day Event ID whose timer you want to start.
Milestone IDSelect or map the Milestone ID whose timer you want to start.
Task IDSelect or map the Task ID whose timer you want to start.

Stop a Timer

Stops a timer for a specific item.

ConnectionEstablish a connection to your LiquidPlanner account.
Treeitem IDSelect or map the Treeitem ID whose timer you want to stop:
  • Event
  • Partial Day Events
  • Milestones
  • Tasks
Event IDSelect or map the Event ID whose timer you want to stop.
Partial Day Event IDSelect or map the Partial Day Event ID whose timer you want to stop.
Milestone IDSelect or map the Milestone ID whose timer you want to stop.
Task ID

Select or map the Task ID whose timer you want to stop.

Clear a Timer

Clears the timer for a specific item.

ConnectionEstablish a connection to your LiquidPlanner account.
Treeitem IDSelect or map the Treeitem ID whose timer you want to clear:
  • Event
  • Partial Day Events
  • Milestones
  • Tasks
Event IDSelect or map the Event ID whose timer you want to clear.
Partial Day Event IDSelect or map the Partial Day Event ID whose timer you want to clear.
Milestone IDSelect or map the Milestone ID whose timer you want to clear.
Task IDSelect or map the Task ID whose timer you want to clear.

Timesheets

Accept a Timesheet

Accepts a specific timesheet.

ConnectionEstablish a connection to your LiquidPlanner account.
Timesheet IDSelect or map the Timesheet ID which you want to accept.

Submit a Timesheet

Submits a specific timesheet.

ConnectionEstablish a connection to your LiquidPlanner account.
Timesheet IDSelect or map the Timesheet ID which you want to submit.

Un-Accept a Timesheet

Unaccepts a specific timesheet.

ConnectionEstablish a connection to your LiquidPlanner account.
Timesheet IDSelect or map the Timesheet ID which you want to un-accept.

Un-Submit a Timesheet

Unsubmits a specific timesheet.

ConnectionEstablish a connection to your LiquidPlanner account.
Timesheet IDSelect or map the Timesheet ID which you want to un-submit.

Commands

Move Item After

Moves an item after another item.

ConnectionEstablish a connection to your LiquidPlanner account.
Treeitem IDSelect or map the Treeitem ID which you want to move after another item.
Other IDSelect or map the Treeitem ID after which you want to move the above-selected item.
Package Other IDSelect or map the Package ID of the Treeitem ID after which you want to move the selected item. This field is not required if you have selected the Other ID.

Move Item Before

Moves an item before another item.

ConnectionEstablish a connection to your LiquidPlanner account.
Treeitem IDSelect or map the Treeitem ID which you want to move before another item.
Other IDSelect or map the Treeitem ID before which you want to move the above-selected item.
Package Other IDSelect or map the Package ID of the Treeitem ID before which you want to move the selected item. This field is not required if you have selected the Other ID.

Documents

You do not have to add the webhooks in the LiquidPlanner as it is automatically done for you once you add and save an instant trigger module to your scenario.

Watch Documents

Triggers when a document has been created or updated.

Webhook NameEnter a name for the webhook.
ConnectionEstablish a connection to your LiquidPlanner account.

Other

Make an API Call

Performs an arbitrary authorized API call.

ConnectionEstablish a connection to your LiquidPlanner account.
URL

Enter a path relative to https://app.liquidplanner.com/api. For example: /v1/workspaces

For the list of available endpoints, refer to the LiquidPlanner API Documentation.
Method

Select the HTTP method you want to use:

GET
to retrieve information for an entry.

POST
to create a new entry.

PUT
to update/replace an existing entry.

PATCH
to make a partial entry update.

DELETE
to delete an entry.

HeadersEnter the desired request headers. You don't have to add authorization headers; we already did that for you.
Query StringEnter the request query string.
BodyEnter the body content for your API call.

Example of Use - List Projects

The following API call returns all the projects from your LiquidPlanner account:

URL:
/v1/workspaces/{workspace_ID}/projects

Method:
GET

jFfcw9T7rT.png

Matches of the search can be found in the module's Output under BundleBody
In our example, 5 projects were returned:

JCNkDox9Xs.png

 

Popular use cases from our blog

automated-data-collection-crm-illustration

How to Automate Data Collection - Part 5: CRM Systems

automated-data-collection-chatbot-marketing-illustration

How to Automate Data Collection - Part 4: Chatbot Marketing

automated-data-collection-paid-ads-illustration

How to Automate Data Collection - Part 3: Paid Ads

automated-data-collection-email-illustration

How to Automate Data Collection - Part 2: Email Marketing Segmentation

personalized-customer-experience-illustration-integromat

5 Automated Solutions to Personalize Customer Experience

data-collection-automation-forms-pt-1

How to Automate Data Collection - Part 1: Online Forms

Didn’t find what you were looking for?

Expert

Find an expert

We feature a network of 450+ certified partners across the globe who are ready to help

Find an expert

Automate any workflow in your business

Sign up for a free account today. No credit card required, no time limits on free plan.